4dflexiplat
  • de
  • en
Material flow
Material flow

After

Total14 min.
Unpack material5 min.
Identify assembly order5 min.
Ergonomy extra time2 min.
Manoeuvres extra time2 min.
Organise missing parts0 min.
Saving on every order = 75 %41 min.
Number of orders per shift2
Number of shifts per working day2

Saving =
Working days/year x Hourly wage x Time saved x No. of orders x No. of shifts
          240              x 40 €             x 41 min.       x 2                 x 2

Total 26.240 € per year